01 / Technical scope
What we engineered and delivered
Automation system with frequency regulation for pumping stations in the water supply network: design, build, testing, commissioning, SCADA integration.
Delivery scope
- PLC & Automation
- SCADA
- Drives & Soft Starters
Equipment & platforms
- WEG
- Schneider Electric
Related references
View allWater & Wastewater
PS Negorci — Gevgelija, remote control
Modernization and remote control (GSM) with power supply and automation of a 22 kW pumping station; PLC control of reservoir level over GSM.
PC JKP Komunalec Gevgelija — 2024
Water & Wastewater
PS Moin — Gevgelija, remote control
Modernization and remote control (GSM) with power supply and automation of a 55 kW pump; PLC control of reservoir level over GSM.
PC JKP Komunalec Gevgelija — 2024
Water & Wastewater
Pumping station TIDZ Prilep 2 × 15 kW
Drinking water supply for the free economic zone: LV switchboards, automation cabinets, PLCs, GSM routers, reservoir level algorithm by well level and running hours, HMI application with alarms.
TIDZ Prilep — 2016