All references
Case study #20/Metals & Cement · Manufacturing
LV main switchboard 2500 A
Dojran Steel, North Macedonia 2022finished

01 / Technical scope
What we engineered and delivered
Low-voltage 2500 A power distribution switchboard — EPLAN design, assembly, testing, commissioning and start-up.
Delivery scope
- Switchgear
Equipment & platforms
- Schneider Electric Prisma P
Related references
View allMetals & Cement
LV main switchboard 2500 A
Low-voltage 2500 A power distribution switchboard — EPLAN design, assembly, testing, commissioning and start-up.
TITAN Cement factory, North Macedonia — 2022
Metals & Cement
Energy management — Vardar Dolomit
Monitoring, analysis and archiving of electricity data with reporting on 15+ feeders.
Vardar Dolomit, Gostivar — 2011
Manufacturing
LV busbar system reconstruction 1250 A
Full replacement of busbars, main feeder switch and outgoing feeders on a 1250 A LV system, with SCADA integration.
BuseMAK — part of BUSE KSW GmbH & Co. KG — 2023