Case study #19/Mining
LV main switchboard 3200 A — crushing process
SASA Mine, North Macedonia 2022finished

01 / Technical scope
What we engineered and delivered
Low-voltage 3200 A power distribution switchboard for the crushing process — EPLAN design, assembly, testing, commissioning and start-up.
Delivery scope
- Switchgear
- Energy Monitoring
Equipment & platforms
- Schneider Electric Prisma P
Related references
View allMining
Pumping station control cabinets 2 × 2×110 kW
Two control automation cabinets for a serial pumping application for mine dewatering — EPLAN design, assembly, testing, commissioning and start-up.
BOR gold mine, Serbia (Weir Minerals England) — 2023
Mining
MV switchboard 12 kV — delivery & installation
12 kV MV switchboard (incomer + 3 × fuse-protected transformers), delivered and installed.
SASA Mine, North Macedonia — 2021
Mining
SASA mine drainage 24 bar — phase two
Drainage of catchment water 200 m underground at 24 bar using three 55 kW pumps in series: distribution cabinets, PLC software, testing and documentation.
SASA Mine, Makedonska Kamenica — 2015