Case study #43/Mining · Water & Wastewater
SASA mine drainage 24 bar — phase two
SASA Mine, Makedonska Kamenica 2015finished

01 / Technical scope
What we engineered and delivered
Drainage of catchment water 200 m underground at 24 bar using three 55 kW pumps in series: distribution cabinets, PLC software, testing and documentation.
Delivery scope
- PLC & Automation
- Switchgear
Equipment & platforms
- Schneider Electric
Related references
View allMining
Pumping station control cabinets 2 × 2×110 kW
Two control automation cabinets for a serial pumping application for mine dewatering — EPLAN design, assembly, testing, commissioning and start-up.
BOR gold mine, Serbia (Weir Minerals England) — 2023
Mining
Groundwater drainage — Brod-Gneotino open cast mine
Piezo stations and well construction (drilling, testing, submersible pumps), power connection, control, automation, SCADA and commissioning.
AD ESM — 2021
Mining
Surface drainage — Brod-Gneotino & Suvodol mines
Continuous surface drainage at an average 100 l/s over 160 m head: 1 × 475 kW + 2 × 235 kW pumping units, 5+ km of pipeline, power supply, automation and SCADA integration.
AD ESM — 2021