All references
Case study #43/Mining · Water & Wastewater

SASA mine drainage 24 bar — phase two

SASA Mine, Makedonska Kamenica 2015finished
SASA mine drainage 24 bar — phase two — PLC control cabinet and I/O architecture
PLC control cabinet and I/O architecture
01 / Technical scope

What we engineered and delivered

Drainage of catchment water 200 m underground at 24 bar using three 55 kW pumps in series: distribution cabinets, PLC software, testing and documentation.

Delivery scope
  • PLC & Automation
  • Switchgear
Equipment & platforms
  • Schneider Electric

Related references

View all