All references
Case study #25/Mining · Energy & Utilities · Water & Wastewater

Surface drainage — Brod-Gneotino & Suvodol mines

AD ESM 2021finished
Surface drainage — Brod-Gneotino & Suvodol mines — PLC control cabinet and I/O architecture
PLC control cabinet and I/O architecture
01 / Technical scope

What we engineered and delivered

Continuous surface drainage at an average 100 l/s over 160 m head: 1 × 475 kW + 2 × 235 kW pumping units, 5+ km of pipeline, power supply, automation and SCADA integration.

Outcome

Coal production secured during torrential rain events

Delivery scope
  • PLC & Automation
  • SCADA
  • Drives & Soft Starters
Equipment & platforms
  • WEG
  • Schneider Electric
  • Flexim
  • Aplisens

Related references

View all