All references
Case study #26/Mining · Energy & Utilities · Water & Wastewater
Suvodol mine flood — emergency dewatering
AD ESM 2020finished

01 / Technical scope
What we engineered and delivered
Emergency procurement and commissioning of heavy-duty sludge pumps: 3 × 110 kW (70 l/s @ 90 m) and 3 × 90 kW (50 l/s @ 60 m), with power, control and protection.
Outcome
National power system protected after natural disaster
Delivery scope
- Drives & Soft Starters
- PLC & Automation
Equipment & platforms
- WEG SSW900
- Tsurumi
- Dragflow
Related references
View allMining
Groundwater drainage — Brod-Gneotino open cast mine
Piezo stations and well construction (drilling, testing, submersible pumps), power connection, control, automation, SCADA and commissioning.
AD ESM — 2021
Mining
Surface drainage — Brod-Gneotino & Suvodol mines
Continuous surface drainage at an average 100 l/s over 160 m head: 1 × 475 kW + 2 × 235 kW pumping units, 5+ km of pipeline, power supply, automation and SCADA integration.
AD ESM — 2021
Energy & Utilities
Pumping station Topli Vodi — Kočani
PID solution with frequency regulation of four pump units (22, 37.5, 15, 30 kW), pipeline filling sequence, pump-curve integration, cavitation and dry-run protection.
Geothermal Kočani — 2016