Case study #42/Water & Wastewater · Infrastructure
Pumping station 1 MVA — Mitrovica, Kosovo
Mitrovica, Kosovo 2015finished

01 / Technical scope
What we engineered and delivered
Full MV/LV reconstruction with 2 × 200 kW and 1 × 400 kW pump units, transformer upgrade 400 kVA → 1250 kVA, LV switchboard, SCADA and level-driven automation over 10 km GSM link.
Delivery scope
- SCADA
- Switchgear
- PLC & Automation
Equipment & platforms
- Schneider Electric
Related references
View allWater & Wastewater
PS Negorci — Gevgelija, remote control
Modernization and remote control (GSM) with power supply and automation of a 22 kW pumping station; PLC control of reservoir level over GSM.
PC JKP Komunalec Gevgelija — 2024
Water & Wastewater
PS Moin — Gevgelija, remote control
Modernization and remote control (GSM) with power supply and automation of a 55 kW pump; PLC control of reservoir level over GSM.
PC JKP Komunalec Gevgelija — 2024
Water & Wastewater
Pumping stations — water network Novaci
Automation system with frequency regulation for pumping stations in the water supply network: design, build, testing, commissioning, SCADA integration.
Ministry of Transport and Communications, North Macedonia — 2023