All references
Case study #01/Water & Wastewater · Infrastructure

PS Negorci — Gevgelija, remote control

PC JKP Komunalec Gevgelija 2024ongoing
PS Negorci — Gevgelija, remote control — PLC control cabinet and I/O architecture
PLC control cabinet and I/O architecture
01 / Technical scope

What we engineered and delivered

Modernization and remote control (GSM) with power supply and automation of a 22 kW pumping station; PLC control of reservoir level over GSM.

Outcome

Remote level control, no permanent on-site operator

Delivery scope
  • PLC & Automation
  • SCADA
  • Maintenance & Retrofit
Equipment & platforms
  • WEG
  • Schneider Electric

Related references

View all