All references
Case study #05/Water & Wastewater
Wastewater treatment plant Perovo
EU funds 2024ongoing

01 / Technical scope
What we engineered and delivered
Automation of a wastewater treatment system covering pumping stations and the treatment station.
Delivery scope
- PLC & Automation
- SCADA
Equipment & platforms
- Schneider Electric
- Aplisens
Related references
View allWater & Wastewater
PS Negorci — Gevgelija, remote control
Modernization and remote control (GSM) with power supply and automation of a 22 kW pumping station; PLC control of reservoir level over GSM.
PC JKP Komunalec Gevgelija — 2024
Water & Wastewater
PS Moin — Gevgelija, remote control
Modernization and remote control (GSM) with power supply and automation of a 55 kW pump; PLC control of reservoir level over GSM.
PC JKP Komunalec Gevgelija — 2024
Water & Wastewater
Pumping stations — water network Novaci
Automation system with frequency regulation for pumping stations in the water supply network: design, build, testing, commissioning, SCADA integration.
Ministry of Transport and Communications, North Macedonia — 2023