All references
Case study #09/Mining · Water & Wastewater

Pumping station control cabinets 2 × 2×110 kW

BOR gold mine, Serbia (Weir Minerals England) 2023finished
Pumping station control cabinets 2 × 2×110 kW — PLC control cabinet and I/O architecture
PLC control cabinet and I/O architecture
01 / Technical scope

What we engineered and delivered

Two control automation cabinets for a serial pumping application for mine dewatering — EPLAN design, assembly, testing, commissioning and start-up.

Delivery scope
  • PLC & Automation
  • Switchgear
Equipment & platforms
  • WEG
  • Schneider Electric

Related references

View all